Relining a collapsing culvert

Our CCTV survey of the culvert running beneath a busy main road, revealed major damage and faults to the structure. There were significant cracks, holes and root incursions along the pipe causing immediate threat of collapse.

The MTS lining team took up the challenge of repairing the pipeline without any digging or disruption to the road.

Using double thickness liner (7.5mm), the new sleeve completely covered the interior of the pipe and all the faults and cracks.

Following the relining process, the pipe was once again structurally sound.